Bengbu Zhengda Compressor Co., Ltd.
Banner

Sales Department: 0552-3825188 0552-3825333

Accessories Department: 15955260712

Company Fax: 0552-3825255, 3825200

CNG Department: 13865028777 13865066118

After-sales service: 0552-3825155 0552-3825156

Company Address: No. 2581, Shuangdun Road, Huaishang District, Bengbu, Anhui Province

Company email: zdysj@126.com ahzdysj@126.com

新闻详情
Home > News > Content

The main components of carbon monoxide compressor

Edit:Bengbu Zhengda Compressor Co., Ltd.UpDate:2022-02-08

The carbon monoxide compressor is mainly composed of the compressor host, motor, common chassis, gas circuit system, cooling system, lubrication system, instrument operation system, sewage system, electrical system, etc. All components are basically installed on a common chassis, which is installed on a cement foundation plane.

It is a fixed gas supply station. The connecting pipelines between the equipment and the fixing points between the equipment and the base are all detachable. Therefore, this type of compressor is extremely convenient in transportation, installation, operation and maintenance.

1. Fully open the inlet valve of the standby machine, the first stop valve of the outlet, and each circuit valve.

2. Start the standby engine oiler and crank for 15 minutes before disengaging the cranking device.

3. Contact the electrical dispatcher to start the standby main motor.

4. Slowly close the valve of the standby machine until the outlet pressure is about 0.12 MPa.

5. Slowly close the 2-return valve of the standby machine until the 2-return valve is fully closed.

6. Slowly close the 4-way hand valve on site until it is fully closed.

7. The central control slowly closes the standby machine 4 return self-adjusting valve according to the inlet pressure, and fully opens the standby machine outlet valve after the standby machine 4 section outlet pressure is slightly higher than the raw gas compressor inlet pressure by 0.1Mpa.

8. Adjust fuel gas according to dispatch requirements

9. At the same time, slowly open the 4-way self-adjusting valve of the running machine to full open.

10. Slowly close the outlet valve of the running machine. (If the outlet pressure increases, slightly open the 4-way valve on site)

11. Slowly open the 1-return, 2-return, and 4-return valves in sequence according to the inlet pressure.

12. Put the carbon monoxide compressor to the fuel gas valve into use according to the dispatching requirements.