Sales Department: 0552-3825188 0552-3825333
Accessories Department: 15955260712
Company Fax: 0552-3825255, 3825200
CNG Department: 13865028777 13865066118
After-sales service: 0552-3825155 0552-3825156
Company Address: No. 2581, Shuangdun Road, Huaishang District, Bengbu, Anhui Province
Company email: zdysj@126.com ahzdysj@126.com
The compound air compression station system includes: screw compressor, piston supercharger, blast dryer, refrigeration dryer, pipeline filter, air supply pipeline and valve, monitoring system, etc. The control system adopts the local cabinet control mode, and the level of self-control is high. The air compression station system has functions of online status monitoring, early warning, and emergency response.
The air compressor station has 120 hours (5 days) continuous non-stop pressurization capacity, gas filtration, drying, purification and other functions, with intelligent remote monitoring and automatic protection functions.
The screw compressor and supercharger in this air compressor station are the core components of the project, and products with high quality and high reliability at home and abroad are preferred.
Environmental adaptability requirements: ambient temperature -20℃~+45℃, relative humidity ≯90%RH(25℃), altitude ≯300m. Outlet gas quality requirements: gas pressure dew point -40℃; oil content ≤0.01mg/m3, particle grade ≤0.01μm.
Cooling method: closed water cooling, water cooling, air cooling, etc.
Application: Three production operations: 1) Maintain oil well pressure, 2) Inject oil wells together with hydrocarbons, nitrogen flooding, 3) Gas cap, improve oil and gas productivity, 4) Gas lift operations, avoid downhole accidents, 5) Acidification, pressure Cracking, can remove blockage, increase production, 6) thermal recovery assist drainage, improve recovery efficiency, 7) heat insulation of wellbore in steam huff and puff, 8) control mud density, 9) clean oil well, 10) ideal carrier of surfactant, 11 ) Increase the output of oil wells, 12) Extend the life of oil wells.
Pipeline purging: pressure test and purging of pipelines, ultra-high pressure membrane does not need to be equipped with a booster unit, only a high-pressure air compressor unit can directly generate nitrogen above 30bar, and it can be applied to long distances without a booster The large pipeline is purged.
Pipeline nitrogen filling: purging of containers and pipes for handling flammable liquids and gases; replacement and emergency repairs of pipes and containers; use of the inert nature of nitrogen for "gas sealing" to prevent harmful leakage of hazardous materials into the air
Other applications: 1) Coal bed methane regeneration. 2) Natural gas gathering and transportation station. 3) LNG receiving station. 4) Offshore drilling/production platform. 5) Natural gas purification plant
Previous: M-type natural gas filling station